Sign In | Join Free | My ccnmag.com
China Suzhou orl power engineering co ., ltd logo
Suzhou orl power engineering co ., ltd
Suzhou orl power engineering co ., ltd Specializing in the production boiler unit China suppliers
Active Member

9 Years

Home > Boiler Water Wall >

Once Through ISO ASME 76mm Water Tube Boiler Parts

Suzhou orl power engineering co ., ltd
Contact Now

Once Through ISO ASME 76mm Water Tube Boiler Parts

  • 1
  • 2

Brand Name : ORL Power

Model Number : Customization

Certification : ISO9001/SGS/TUV/ASME/EN

Place of Origin : Zhangjiagang,Jiangsu,China

MOQ : 1 Set/Sets 10tons

Price : Contact me | Get Latest Price

Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram

Supply Ability : 100Ton/Tons per Month

Delivery Time : 50~100 Days

Packaging Details : Iron Frame Package

name : Boiler Water Wall

Type : Natural Circulation/Once Through

Usage : Industry/Power Station

Structure : Fire/Water Tube

Fuel : Coal/Gas/Oil-fired, Water Heat

Output : Hot Water/Steam

Weight : 10~1000ton

Product name : For Power Station Boiler Water wall panel from China

Contact Now

Power plant boiler membrane water wall with ISO certification

A waterwall in a boiler is an furnace wall that is comprised of refractory and tubes in a water-tube boiler.The tubes are evenly spaced and generally connect to headers which in turn are connected back to the main generating bank of the boiler.They serve a two fold purpose here in that capture heat that would otherwise escape to the atmosphere and help heat the water in the boiler.And they also help keep the refractory cool(relatively speaking)This prevents spalling of the refractory.

Advantages

1). To guarantee the leakproofness of furnace wall and reduce the air leak of combustion chamber.

2). To achieve the full water cooling of combustion chamber, and the boiler accessories membrane water wall is benefit to prevent coking under the condition of supplemental firing.

3). The thermal storage capacity is small, the warming of combustion chamber is fast and the cooling is also fast, which could shorten the cooling time of boiler’s start and furnace shut down.

4). It is good to adopt top supported water cooled wall and it could reduce the load of boiler framework, which is benefit to overhang.

5) Compared with the bare tubes, the membrane water wall improves the heat absorption capacity of tubes.

6) The factory direct boiler membrane water wall could improve the Preliminary combination degree of boiler parts and reduce the installation workload

Specifications

Name Membrane water panel
Material Carbon steel,Alloy steel,etc.
Tube size Φ38 - 76mm, Customization
Standard ISO , ASME
Model Studded
Dimension Customization
Manufacturing process Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →PolishingTube joint welding→AssemblyWelding →Inspection→Heat treatment→Hydraulic pressure testPainting Packaging
Installation location Around the boiler combustion chamber

Once Through ISO ASME 76mm Water Tube Boiler Parts

Once Through ISO ASME 76mm Water Tube Boiler Parts

FAQ

1. Why choose us?

We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.

We ensure the deliver time, high quality, and the best after-sale service for you.

2. How to order?
Welcome come to our factory for inspecting and discussion the technical details.

Contact Information

  • ADD: 11 East Renmin Road, Zhangjiagang City, Jiangsu, China
  • Phone:+86 0512-56770166
  • E-mail: orl@orlpower.com
  • Website: www.boiler-units.com

Product Tags:

76mm Water Tube Boiler Parts

      

ASME Water Tube Boiler Parts

      
China Once Through ISO ASME 76mm Water Tube Boiler Parts wholesale

Once Through ISO ASME 76mm Water Tube Boiler Parts Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Suzhou orl power engineering co ., ltd
*Subject:
*Message:
Characters Remaining: (0/3000)